Guide · 5 min read · October 6, 2026

How long does it take to build a website?

Most small-business websites take four to eight weeks from kickoff to launch. Ours usually go live in about five. Here's where the time goes — and what makes projects drag.

A typical timeline

  • Week 1 — Discover and scope: goals, audience, sitemap and a timeline you can hold us to.
  • Weeks 2–3 — Design and prototype: wireframes, then full designs you click through before any code.
  • Weeks 3–5 — Build and integrate: development, forms, booking, payments, testing on every screen size.
  • Week 5 — Launch: redirects from the old site, analytics, search-engine basics, then go live.

What makes it faster

  • Content ready early — words, photos and logos.
  • One decision-maker who can approve quickly.
  • A clear list of must-have features (nice-to-haves can follow after launch).

What slows it down

  • Waiting on content — the single most common delay.
  • New features added halfway through.
  • Online stores with many products or complex options.
  • Moving a large old site with many pages to redirect.

Online stores and bigger sites

A store takes longer because every product, option, shipping rule and tax setting has to be right before you take a payment. Large catalogues, custom product builders or integrations with stock and accounting systems add weeks, not days.

Can it be done faster?

Yes, with a tight scope. Our most-booked package is a full redesign live in 30 days. The trick is deciding early and keeping launch focused — you can always add pages after you're live.

Written by the SquidInk USA team · Glendora, CA